Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production requirements. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/